Sathvic Kollu ← All tools
PM / Product tool

Value/Effort 2×2 Matrix

Plot features by Value and Effort on a 2×2 grid. See Quick Wins (high value, low effort), Big Bets (high value, high effort), Fill-ins (low value, low effort), and Time Sinks (low value, high effort). Saves locally. CSV export.

Value →
Effort →
Quick Wins
Big Bets
Fill-ins
Time Sinks

Features

How to actually score Value and Effort

Value is whatever your team agrees value means: revenue impact, NPS lift, strategic fit. Score 1 to 10 relatively, anchored to a known reference. Resist normalising to "everything is a 7".

Effort is engineering and design weeks, not story points. 1 = a day's work. 10 = a quarter. Pad pessimistically; teams underestimate Effort by 2-3x reliably.

The 2×2 is for conversation, not decision. Use it to surface disagreement on what's a Big Bet vs a Time Sink — that disagreement is the actual value.